Risk glossary

 

Demurrage

The cost, or delay period resulting in the cost, charged when a vessel fails to unload or load within the allotted time period, or laytime, provided by contract. A liquidating damages charge for contract breach for detention of the ship.

  • LinkedIn  
  • Save this article
  • Print this page